Peregrine models are ready for plumbing & electrical



The Peregrine models are ready for the next phase. The attention to detail during site work, footings and foundation paid off with a level, square and straight platform for the framing crew.  Now the walls are up, trusses are on and the building is ready for plumbing, electrical and preliminary insulation, sealing and preparation for some of the most important work to insure a comfortable and efficient home. Be sure to stop by and watch these new homes as they get closer to completion.

Framed PeregrineLot 20
Framed Peregrine
Lot 20

Framing and roof trusses on the Peregrines



The structure on each home is progressing quickly. As you can see, the roof trusses are now on.


Lot 20 Framing

Lot 21 Framing
View from the westside

Energy efficiency components in the Peregrines



Framing on the Peregrine begins energy efficiency
Lot 20 framing
Framing on the Peregrine begins energy efficiency
Lot 20 framing

The photos below show the energy components as the floor system is being installed. Note the long green board and adjacent to it the pink foam board insulation R-10, highly compacted very efficient insulation provide a thermal break between the foundation wall and the floor joists.  This is the first step in providing an integrated, sealed insulation system from the foundation walls up.  We will continue to provide you with detailed pictures for why this may be the best house you can buy!

Energy subfloor on the Peregrine
Lot 21 subfloor
Energy thermal break on Peregrine
Lot 21 with thermal break

Waterproofing the Peregrine models



Waterproofing is on the foundations, backfill comes next and then we start framing. Note the black waterproofing on the outside of the foundation in the 2nd photograph.

Waterproofing on the Peregrine
Lot 20 and 21 from High View St.
Waterproofing on the Peregrine
Foundation with water-proofing