Foundation forms on the Peregrine models



On both Peregrine models, the forms for each house are being put up. Here are photos of the temporary forms. After the concrete has set, the forms will be removed and waterproofing on the exterior will begin. Construction will move fast. Soon the framing will start and you’ll be able to see the house take shape.

Peregrine forms
Lot 20 Forms in Place
Peregrine forms
Lot 21 over to Lot 20 house Forms

Footings are in on the Peregrines



Footings are now in place on each of the Peregrine models. The first step in the creation of the framework of each building has begun. Here are photos of the footings in place for the houses and one of the garages.

Lot 20 Garage Footing

Footings on Peregrine

footings on Peregrine model
Lot 21 over to Lot 20 house
footings on Peregrine modelLot 20 House

Peregrine homes get backfilled



On both Peregrine models, the foundations have been backfilled and are ready for the lumber and framing which starts this week.

Peregrine backfilled Lot 20 Peregrine backfilled Lot 21

Construction on the Peregrines Begins



This is the initial phase of construction for the two new Peregrine models at the Highlands in Langley on Whidbey Island. Leveling of the building pad and ‘digout’ of the perimeter of the home for the foundation footings. The first 2 photos show the lots before any work began.

Construction begins on PerregrineLot 20 Construction begins on PerregrineLot 21
Construction digout on PeregrineLot 20 digout Construction digout on PeregrineLot 20 digout
Construction digout on PeregrineLot 21 digout